Day 5 - Thursday, March 20
Our last work
day in the DR started with an early 7am breakfast. Then, at 8:15, we got on
the bus, headed to Mission Emanuel. From there we ventured to Alex P’s house,
where we picked up where we left off working on Monday. Using an assembly line,
we were able to move hundreds of blocks and buckets of sand up the stairs, to
be used in construction of the house. We then worked in small groups, each
laying blocks and mortar to construct the walls of Alex P’s house. Then lunch
came around, ending our work day. We give our gratitude to Jorgito and his team
for guiding us on the worksite and being patient with us throughout the week.
After
lunch, we toured Mission Emanuel’s water purification facility. Carlos showed
us how water is processed through osmosis, and from there it’s bottled and
ready to distribute. Their facility generates 12,000 5-gallon bottles of water
per month, totaling 60,000 gallons of purified water.
After
the tour, we headed to the Women’s Cooperative, a store founded by the women of
Mission Emanuel to sell their hand-made crafts. They had a wide variety of
jewelry, shirts, ornaments, and more, all made by the women of the store. I
personally bought a bucket line t-shirt and a Christmas ornament.
Before
going back to the hotel, we stopped by the Chruch and Alex’s house to give our
blessings upon the work we had accomplished and the work that is to come. At
this time, we had to say goodbye to our beloved translators that have been with
us throughout the week. We will miss the 3 amigas. We then ended our day with a
group dinner at “Meats & More”, and a stop at “Bon” for some late night ice
cream before heading back.
Today
was an amazing day!
- Owen Long

Comments
Post a Comment